Project Detail
Emergency Bridge Replacement
SR-107 and SR-81
Emergency Bridge Replacement
SR-107 and SR-81
Replacement of the SR-81, SR-107, and SR-353 bridges over the Nolichucky River, destroyed by Hurricane Helene, is critical to Greene and Washington County residents, as they provide connectivity between the Greeneville, Jonesborough, and Erwin communities.
Made possible by the Transportation Modernization Act (TMA), the Progressive Design-Build approach is a project delivery method that involves a Design-Build team early in the project’s lifecycle. This method allows the design and construction phases to overlap, facilitating continuous collaboration among the owner, designers, and builders.
This approach can lead to faster project completion.
WA provided pre-construction route surveying services in a record time of 13 days leveraging traditional surveying as well as terrestrial, aerial, bathymetric lidar surveying. WA also provided construction staking services.
Location: Greene County and Washington County, Tennessee
Client: Tennessee Dept. of Transportation